EasyManua.ls Logo

SICK RFH5 Series

SICK RFH5 Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Commissioning
7.1 Overview of the commissioning steps
7.1.1 Commissioning using SOPAS ET for demonstration purposes
RFH5xx
SOPAS ET
SiLink2 Master 1 Transponder 2
1
SIG200 (IO-Link Master)
2
Transponder
Prerequisites:
SICK SiLink2 IO-Link master with wall plug and enclosed USB cable
IO-Link device (RFH5xx)
IO-Link cable (male/female connector)
Computer (Windows) with installed SOPAS ET configuration software
Certain functions (e.g., Edit parameters) require you to be logged in to the device
( Device > Log in menu).
Table 6: Factory-set passwords
User level Authorizations Keyword according to factory
setting
Maintenance Read parameters operator
Maintenance Read and write parameters maintenance
Service Read and write parameters service
Procedure:
1. Connect the device (RFH5xx) to the voltage-free IO-Link master.
COMMISSIONING
7
8025309/1KDE/2023-12-19 | SICK O P E R A T I N G I N S T R U C T I O N S | RFH5xx
31
Subject to change without notice

Related product manuals