EasyManua.ls Logo

Sicma SA 85 - Setup Procedures; Starting Up and Operation

Sicma SA 85
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sicma S.p.A.
Miglianico (CH)
page 17
Picture 18 Picture 19
STARTING UP
Now that all setting up operations are completed, your machine is ready to be used; after reaching
the work place we advice to engage power takeoff only after having lifted the machine of a few
centimetres with the tractor elevator. After this, it is possible to start engine, engage power takeoff,
drop the machine down to work position and start using it.
ROAD TRANSPORT
While transporting the machine it is very important to follow the road traffic code of the country
where you circulate.
SET ASIDE
If the tiller will not be used for a long period of time, we advice to:
1 Wash the machine accurately and dry it.
2 Check out all equipment and replace eventual damaged or worn parts.
3 Tighten strongly all bolts and nuts (ref. bolts and nuts tightening table).
Make an accurate greasing and finally protect the whole machine with a tarpaulin and put it in a dry
place.

Related product manuals