Do you have a question about the Siel Green Point 6÷20KVA and is the answer not in the manual?
Guidelines for safe installation of the UPS unit, including environmental considerations and cable management.
Precautions and procedures for operating the UPS, including disconnection and avoiding foreign objects.
Procedures and warnings for maintenance, servicing, and handling faults, emphasizing qualified personnel.
Procedures for unpacking the UPS and inspecting for any damage during transit.
Guidelines for wiring, including selecting appropriate wires and connecting protective earth ground.
Outlines requirements and procedures for installing UPS units in parallel.
Details how to turn the UPS on and off in different modes (Line, Battery).
Step-by-step guide for adding a new UPS unit to an existing parallel system.
Procedures for safely removing a UPS unit from a parallel configuration.