Immediately perform an inspection after such faults.
9.2.2 Initial inspection
Perform the following checks after approximately 500 operating hours or at the latest after six
months:
Table 9-1 Checks after installation or repair
Check When the
motor is
running
At stand‐
still
The electrical parameters are maintained. X
The smooth running characteristics and machine running noise have not
deteriorated.
X
The motor foundation has no cracks and indentations. (*) X X
(*) You can perform these checks while the motor is running or at a standstill.
Additional checks may also be required according to the system-specific conditions.
NOTICE
If you detect any deviations during the inspection, you must rectify them immediately. They
may otherwise damage the motor.
9.2.3 Main inspection
While the motor is running, check that:
The stated electrical characteristics are being observed
The smooth running characteristics and machine running noise have not deteriorated
Once the machine has been shut down, check that:
The motor foundation has no indentations or cracks
The machine is aligned within the permissible tolerance ranges
All the fixing bolts/screws for the mechanical and electrical connections have been
securely tightened
The winding insulation resistances are sufficiently high (Page 50)
Any bearing insulation has been fitted as shown on plates and labeling.
Cables and insulating parts and components are in good condition and there is no
evidence of discoloring
Maintenance
9.2 Inspection and maintenance
SIMOTICS M-1PH8 1PH818., 1PH822.
Operating Instructions 07/2016 103