Building Technologies 74 319 0617 0 a 17.04.2008 22/180
en
en English
Installation and commissioning heating controller
Do not throw these instructions away but keep them with the controller!
Installation
Place of installation
In a dry room, e.g. the boiler room
Mounting choices:
In a control panel (on the inner wall or on a top hat rail)
On a panel
In the control panel front
In the sloping front of a control desk
Permissible ambient temperature: 0...50 °C
Electrical installation
Local regulations for electrical installations must be complied with
Only qualified staff may carry out electrical installations
Cable tension relief must be provided
The cables from the controller to the actuator and the pump carry mains voltage
The cables to the sensors should not be run parallel to mains carrying cable (e.g. power sup-
ply for the pump) (insulation class II to EN 60730!)
If a device is defective or damaged, immediately disconnect it from power and replace it.
Permissible cable lengths
For all sensors and external contacts:
Copper cable 0.6 mm dia.
Copper cable 1.0 mm
2
Copper cable 1.5 mm
2
max. 20 m
max. 80 m
max. 120 m
For the room units:
Copper cable 0.25 mm
2
Copper cable 0.5 mm
2
max 25 m
max. 50 m