EasyManua.ls Logo

Siemens OLM/G11-1300 V4.0 - Page 17

Siemens OLM/G11-1300 V4.0
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Network Topologies
3.2 Star Topology
SIMATIC NET PROFIBUS, Optical Link Module
Operating Instructions, 07/2008, A2B00065774O, Edition V1.5
11
When the monitoring on the optical channels is active, the fiber-optic links are
monitored by the connected OLMs.
Note:
Unused optical channels you intend to use later to expand the network cause a
broken fiber-optic cable signal if the monitoring is active. You can avoid this error
message by setting unused channels to the mode bus without fiber-optic link
monitoring”. Remember that the optical channels that are not connected must be
protected against external light and pollution by protective caps.

Table of Contents

Related product manuals