44
Internal Accessories
Electric Motor Operator
Mounting of “B” Switch
“B” Switch Assembly
10.) Connect the MTR-Connector and the Fuse Connector
to the Motor and Fuse Holder. Connect the RC+ Con-
nector and RC- Connector to the Remote Close Sole-
noid.
11.) Install the “B” Switch assembly on the reset mechanism
assembly. Make sure to install the Insulator between the
Switch and metal bracket. Secure the assembly with the
two #4-40 x 1/2" screws. Torque screws to 4-6 in-lbs.
Check to be sure the Actuator fits into the slot in the push
link and does not bind
12.) Route the two wires attached to the “B” Switch from the
right side of the breaker to the left side of the breaker.
The wires need to be fed under the mechanism plates.
13.) Connect the J 1-8 Connector and the J 1-9 Connector.