Do you have a question about the Siemens SICHARGE D Dispenser and is the answer not in the manual?
Type | DC Fast Charger |
---|---|
Output Current | up to 500 A |
Cooling | Liquid cooling |
Efficiency | > 95% |
Protection Class | IP54 |
Operating Temperature | -30°C to +50°C |
Connector Types | CCS, CHAdeMO |
Output Voltage | up to 1000 V |
Input Voltage | 3-phase 400 V |
Display | Touchscreen |
Communication Protocols | OCPP 1.6 |
Dimensions | 800 x 600 x 2200 mm |
Charging Standard | CCS, CHAdeMO |
Explains the warning notice system for safety and property damage.
Defines qualified personnel for product operation.
Requirements for safe and proper product operation.
Lists trademarks and publisher's content review statement.
Information on the purpose and use of the operating instructions.
Requirements for keeping the operating instructions safe.
Guidance on how to correctly use the operating instructions.
Specifies validity based on software/hardware versions.
Basic safety instructions and product information.
Describes dispenser interaction with charging station.
Lists safety guidelines and regulations.
Identifies intended users of instructions.
Information on open-source software use.
General safety precautions and intended use of the device.
Defines intended use and restrictions on device modifications.
Defines qualified personnel for work on the dispenser.
Security measures to prevent unauthorized access to the dispenser.
Lists required PPE for safety during work.
Specifies fall arresters and hazards of raised loads.
Warns about hazards of improper transport.
Guidelines for maintaining clean and safe work areas.
Identifies hazards and safety area for mounting.
Warns about falling parts, crushing, cuts, and hot surfaces.
Precautions against flammable liquids and fire hazards.
Risks associated with inadequate ventilation.
Measures to prevent water and liquid ingress.
Warnings about using damaged devices or parts.
Outlines the five safety rules for electrical work.
Risks of electric shock from improper grounding.
Hazards from loose power connections.
Warnings about residual voltage in capacitors.
Confirms no interference with pacemakers/implants.
Details EMC standards and emission limits.
Shows safety sign on packaging and its meaning.
Shows safety sign inside dispenser and its meaning.
Describes the location of the device nameplate.
Details the information found on the device nameplate.
Explains how the emergency stop is triggered.
Procedure to revoke the emergency stop.
Importance of a holistic industrial security concept.
Configuration for secure communication and recommendations.
Recommendation to use current product versions for security.
General description of the dispenser and its purpose.
Details the dispenser's performance and functionality.
Covers EMC class, LEDs, noise, protection, and temperature.
Information on software updates.
Lists typical areas where the dispenser is used.
Describes the connection and interface.
Specifies vehicle standards for charging compatibility.
Describes functions and features of the connected station.
Instructions for laying cables between station and dispenser.
Lists article numbers and corresponding dispenser configurations.
Identifies and illustrates controls like LED strips and plugs.
Explains the meaning of different LED colors.
Describes the charging plug and its holder.
Information on the optional DC meter display.
Describes how the locking system works and operates.
Instructions for replacing lock cylinders.
Details the CCS plug and its pin assignment.
Explains the interlock for safe charging connections.
Explains temperature sensors in charging cables.
Lists technical performance specifications for CCS2.
Describes the dispenser's cabinet material and color.
Shows a diagram of the dispenser's interior components.
Overview of transport options and packaging.
Instructions for transporting on a load carrier.
Illustrates and describes forklift transport.
Step-by-step guide for forklift transport.
Instructions for crane transport and safety.
Lists items included in the accessories kit box.
Details packaging elements for road transport.
Instructions for proper load securing during road transport.
Details packaging elements for air transport.
Details packaging and preservation for sea transport.
Shows packaging illustration for sea transport.
Specifies requirements for proper storage.
Warnings and recommendations for long-term storage.
Lists required tools, materials, and lifting gear for installation.
Guidelines for selecting a safe installation location.
Selecting location based on noise emission regulations.
Specifies required minimum clearances around the dispenser.
Recommends spacing and ceiling clearance.
Advises on protecting the dispenser from direct sunlight.
Specifies the maximum operating temperature.
Describes the dispenser's airflow direction.
Details requirements for electrical connection.
Recommends impact protection and notes swivel range.
Requirements for the concrete base area.
Details on fastening points and foundation openings.
Details dimensions for fastening points.
Guidance on drilling and cable routing.
Guidelines for selecting and connecting cables.
Requirements for implementing system ground.
Procedures for checking delivery for completeness and correctness.
Steps for documenting and reporting damage.
Rules for routing auxiliary power and communication cables.
Steps to prepare the auxiliary power supply cable.
Instructions for connecting the Ethernet communication cable.
Steps to prepare the DC cables for connection.
Procedure to remove the cable gland plate.
Instructions for lifting and positioning the dispenser.
Checks for stud bolts in the foundation.
Steps for inserting cables into the dispenser.
Lists tools and fasteners for alignment and mounting.
Step-by-step guide for aligning and mounting.
Instructions for installing the dispenser roof.
Steps to install cable glands into the plate.
Steps to mount the dispenser baseboards.
Safety precautions for electrical connection.
Instructions for connecting the auxiliary power supply.
Steps to prepare individual cable conductors.
Steps to connect protective, L, and N conductors.
Shows connections for DC and protective conductors.
Steps to prepare individual conductors for connection.
Steps to fasten conductors and insulate sleeves.
Details connections for the 7-pin shielded signal cable.
Instructions for connecting the Ethernet communication cable.
Safety checks before starting commissioning.
Procedure for switching on the charging station.
Describes the automatic startup process.
Procedure for shutting down the charging station.
Procedures for restarting the charging station.
How to activate and use service mode.
Safety precautions for operating the charging station.
Guidelines for using the touch screen interface.
Initial steps for starting a charging process.
Displays available charging ports and their states.
Details options like RFID, PIN, QR code, and credit card.
Procedure for connecting the charging cable to the vehicle.
Shows how to monitor charging status and details.
Explains inactivity timeout and log-off procedures.
Lists conditions for automatic charging termination.
Steps to manually stop a charging process.
How to access help and contact the service hotline.
Details the emergency stop error message.
Explains the state when the emergency stop is active.
Procedure to revoke the emergency stop.
Explains the "out of service" error and its causes.
How service personnel localize and correct faults.
Explains individual outlet errors and their status.
How service personnel localize and correct faults.
Explains the error when the cable doesn't lock.
Safety precautions for maintenance and service work.
Specifies intervals for testing and checks.
Reference to a checklist for station inspection.
Procedures and warnings for cleaning the dispenser cabinet.
Lists approved cleaning agents.
Steps for cleaning the cabinet exterior.
Instructions for cleaning the charging cable.
Instructions for replacing dispenser air filters.
How to check and tighten charging cable glands.
Provides order number for the spare part list.
Recommendations for environmentally friendly disposal of packaging.
Guidance for environmentally sound disposal of the device.
Details rated power, voltage, current, and outlet options.
Specifies operating temperature, altitude, and humidity.
Covers user interface, authentication, and network.
Lists standards for charging and communication protocols.
Details EMC standards and conformity certifications.
States compliance with harmonized European standards.
Provides information on where to download the document.
Lists abbreviations used in the instructions.
Explains key terms used in the instructions.
Checks for installation location.
Base area preparation and checks.
Cable preparation and checks.
Steps for goods acceptance and dispenser transport.
Steps for dispenser installation and connection.
Steps for commissioning and testing.
Index entries from A to D.
Index entries from E to P.
Index entries from Q to T.
Provides Siemens contact details and website.