3 Commissioning using IOP-2
G120X commissioning guide for permanent magnet motors PMSM
Entry-ID: 109780815, V1.0, 07/2020
© Siemens AG
2020 All rights reserved
3 Commissioning using IOP-2
3.1 Preconditions
• Mounting, wiring and safety requirements are done in accordance to G120X Operating
instructions
• G120X drive and IOP-2 are both in factory setting
• User has fundamental skills with drive commissioning
Note: If not explicitly mentioned in the following procedure the inverter setting or parameter
value is to remain in factory setting.
3.2 Procedure
Table 3-1
From initial screen go to Setup menu and
use Advanced Startup when
commissioning PM motor
If the inverter is not in factory setting do it
now: Factory Reset → Drive factory reset