EasyManuals Logo

Sievers TOC 820 User Manual

Default Icon
255 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #151 background imageLoading...
Page #151 background image
Ionics Instruments 2004 Page 8-17 DLM 30007-08 Rev. A
OXIDIZER INSTALLATION
ENTER
CLEAR
INSTALL: 30 DAYS AGO
INSTALL DT. : 11/27/98
CURRENT DT. : 12/23/98
ENT = SET W/CURRENT DT.
CLR = EXIT
FIGURE 8-7: OXIDIZER Status and INSTALLATION Screen
The amount of oxidizer in the reservoir and the date when the
oxidizer reservoir was installed (INSTALL DT) is shown. The install
date will be changed to the current date as described below.
3. To change the INSTALL date to today's date, press ENTER.
4. If password protection is enabled, the ENTER PASSWORD screen is
displayed; enter the password. Otherwise, go to step 5.
ENTER
CLEAR
ENTER PASSWORD
ENT= SAVE CHAR/PSWD
CLR= RESTART/EXIT
A
RROWS = CHANGE CHAR
FIGURE 8-8: ENTER PASSWORD Screen
5. The display will change to the Oxidizer Status and Installation screen
and display the new install date. The program prompts you to confirm
the new install date. Press ENTER to store the new installation date
and return to the OXIDIZER INSTALLATION screen. Press CLEAR
to exit without changing the value.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sievers TOC 820 and is the answer not in the manual?

Sievers TOC 820 Specifications

General IconGeneral
BrandSievers
ModelTOC 820
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals