EasyManua.ls Logo

Sigma TANDEM VECTOR - Page 40

Sigma TANDEM VECTOR
175 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SIGMA TANDEM SYSTEM OWNER’S MANUAL
Page 2:X
Section 2: Equipment • Chapter 3 - Packing the Reserve w/ Skyhook 11301 - 00.00.0000
Once the canopy has been correctly attached
to the risers and while it is still laid on its side,
begin to attach the reserve steering toggles
using the following steps:
Pass steering line through grommet from back
side.
Thread toggle tip through loop at end of
steering line.
Pull steering line tight to secure Larks Head
connection.

Table of Contents