EasyManua.ls Logo

Sigma TANDEM VECTOR - Page 66

Sigma TANDEM VECTOR
175 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SIGMA TANDEM SYSTEM OWNER’S MANUAL
Page 28:X
Section 2: Equipment • Chapter 3 - Packing the Reserve w/ Skyhook 11301 - 00.00.0000
Close the Skyhook cover flap (2A) over the
Skyhook assemblage, pass the reserve closing
loop through its grommet, and secure with
the temporary pin.
Pass the pull-up cord through the base of the
reserve pilot chute and out the grommet in
the center of the pilot chute cap. Ensure that
the pull-up cord did not pass around any of
the spring coils inside.

Table of Contents