SIGMA TANDEM SYSTEM OWNER’S MANUAL
Page 30:X
Section 2: Equipment • Chapter 3 - Packing the Reserve w/ Skyhook 11301 - 00.00.0000
...and secure with the temp pin.
Pull all of the reserve pilot chute material out
of the spring coils and ensure that the pilot
chute base is centered under the cap.
S-fold the pilot chute material to within 1" of
the edge of the pilot chute cap.
Close the center flap (flap #3) over the pilot
chute and secure with the temp pin.