EasyManua.ls Logo

Sime Format 30/60 BF - User Manual

Sime Format 30/60 BF
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
CONTENTS
1 DESCRIPTION OF THE BOILER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 73
2 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 76
3 CHARACTERISTICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 84
4 USE AND MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 87
INSTALLER INSTRUCTIONS
IMPORTANT
When carrying out commissioning of the boiler, you are highly recommended to perform the following checks:
Make sure that there are no liquids or inflammable materials in the immediate vicinity of the boiler.
Make sure that the electrical connections have been made correctly and that the earth wire is connected to a
good earthing system.
Open the gas tap and check the soundness of the connections, including that of the burner.
Make sure that the boiler is set for operation for the type of gas supplied.
Check that the flue pipe for the outlet of the products of the combustion is unobstructed and has been pro-
perly installed.
Make sure that any shutoff valves are open.
Make sure that the system is charged with water and is thoroughly vented.
Check that the circulating pump is not locked (CAUTION: Remember to release the pump coupled with the control
panel, if necessary, to protect the electronic control card).
Purge the system, bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas
valve inlet.
FORMAT 25-30/60
ENGLISH
FONDERIE SIME S.p.A. of Via Garbo 27 - Legnago (VR) - Italy declares that its hot water boilers, which bear the CE mark under
Gas Directive 90/396/CEE and are fitted with a safety thermostat calibrated to a maximum of 11C, are not subject to appli-
cation of PED Directive 97/23/CEE as they meet the requirements of article 1 paragraph 3.6 of the Directive.
Question and Answer IconNeed help?

Do you have a question about the Sime Format 30/60 BF and is the answer not in the manual?

Summary

IMPORTANT Commissioning Checks

1 Boiler Description and Models

1.2.1 25;60 OF Model Dimensions

Specific dimensional drawings and connection details for the 25/60 OF boiler.

1.2.2 25;60 BF & 30;60 BF Models Dimensions

Dimensional drawings and connection details for 25/60 BF and 30/60 BF boilers.

1.3 Technical Features

1.4 Functional Diagram

2 Installation Guide

2.1 Ventilation of Boiler Room

Specific ventilation requirements for the boiler room for different boiler versions.

2.3 Connecting Up System

Procedure for connecting the boiler to the system, including hydraulic and gas lines.

2.7 Flue Requirements

2.8 Coaxial Duct for BF Models

2.10 Electrical Connection

2.10.2 Room Stat Connection

Instructions for connecting a room thermostat for better temperature regulation.

2.10.3 Wiring Diagram 25;60 OF

2.10.4 Wiring Diagram 25;60 BF - 30;60 BF

3 Characteristics

3.1.1 Functioning Faults

Explanation of LED indicators for irregular or incorrect boiler functioning.

3.3 Electronic Ignition

3.4 Smoke Safety Device 25;60 OF

3.5 Smoke Pressure Switch 25;60 BF-30;60 BF

3.6 Water Pressure Switch

3.9 Electrical Connection Zone Systems

4 Use and Maintenance

4.1 DHW Production

Information on the boiler's hot water production system, including tank protection and anode checks.

4.2 Gas Valve

Details on the gas valve models, pressure settings, and gas type conversion.

4.2.1 Max and Min Pressure Adjustment (SIT 845 SIGMA)

Step-by-step instructions for adjusting maximum and minimum gas pressure for SIT 845 SIGMA valve.

4.2.2 Max and Min Pressure Adjustment (Honeywell VK 4105 M)

4.3 Heating Output Adjustment

4.7 Cleaning and Maintenance

4.8 Fault Finding

Troubleshooting Combusted Gas Smell

USER INSTRUCTIONS

Temperature Adjustments

How to adjust domestic hot water and central heating temperatures via potentiometers.

Cleaning and Maintenance by Authorized Staff

Information on preventive maintenance and servicing to be performed by authorized personnel.

FAULT FINDING

Ignition Failure & Safety Stat Interception

Diagnosing ignition failures indicated by the red LED and safety stat.

Summary

IMPORTANT Commissioning Checks

1 Boiler Description and Models

1.2.1 25;60 OF Model Dimensions

Specific dimensional drawings and connection details for the 25/60 OF boiler.

1.2.2 25;60 BF & 30;60 BF Models Dimensions

Dimensional drawings and connection details for 25/60 BF and 30/60 BF boilers.

1.3 Technical Features

1.4 Functional Diagram

2 Installation Guide

2.1 Ventilation of Boiler Room

Specific ventilation requirements for the boiler room for different boiler versions.

2.3 Connecting Up System

Procedure for connecting the boiler to the system, including hydraulic and gas lines.

2.7 Flue Requirements

2.8 Coaxial Duct for BF Models

2.10 Electrical Connection

2.10.2 Room Stat Connection

Instructions for connecting a room thermostat for better temperature regulation.

2.10.3 Wiring Diagram 25;60 OF

2.10.4 Wiring Diagram 25;60 BF - 30;60 BF

3 Characteristics

3.1.1 Functioning Faults

Explanation of LED indicators for irregular or incorrect boiler functioning.

3.3 Electronic Ignition

3.4 Smoke Safety Device 25;60 OF

3.5 Smoke Pressure Switch 25;60 BF-30;60 BF

3.6 Water Pressure Switch

3.9 Electrical Connection Zone Systems

4 Use and Maintenance

4.1 DHW Production

Information on the boiler's hot water production system, including tank protection and anode checks.

4.2 Gas Valve

Details on the gas valve models, pressure settings, and gas type conversion.

4.2.1 Max and Min Pressure Adjustment (SIT 845 SIGMA)

Step-by-step instructions for adjusting maximum and minimum gas pressure for SIT 845 SIGMA valve.

4.2.2 Max and Min Pressure Adjustment (Honeywell VK 4105 M)

4.3 Heating Output Adjustment

4.7 Cleaning and Maintenance

4.8 Fault Finding

Troubleshooting Combusted Gas Smell

USER INSTRUCTIONS

Temperature Adjustments

How to adjust domestic hot water and central heating temperatures via potentiometers.

Cleaning and Maintenance by Authorized Staff

Information on preventive maintenance and servicing to be performed by authorized personnel.

FAULT FINDING

Ignition Failure & Safety Stat Interception

Diagnosing ignition failures indicated by the red LED and safety stat.

Sime Format 30/60 BF Specifications

General IconGeneral
Boiler TypeCombi
MountingWall-mounted
FuelNatural Gas
Max working pressure3 bar
NOx emissionsClass 5
Fuel TypeNatural Gas
Central Heating Output (kW)30.0 kW
TypeCombi
Output30 kW
Electrical supply230 V

Related product manuals