EasyManuals Logo

Skyjack SJ86T User Manual

Skyjack SJ86T
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
Page 34 December 2007
SJ 86T
It is the responsibility of the operator to read, completely understand and follow all instructions and warnings
contained in this operating manual and on the MEWP.
FAMILIARIZATION
Test Emergency Power
1. On base control console, push in
emergency stop button to turn engine off.
2. On platform control console, push in
emergency stop button.
CAUTION
When operating on auxiliary power, do
not operate more than one function
at a time to avoid overloading 12-Volt
auxiliary pump motor.
NOTE
To conserve battery power, test each
function through a partial cycle.
3. On base control console, pull out
emergency stop button.
4. On base control console, turn off/base/
platform key switch to platform
position.
5. Select emergency power
position from start/function enable/
emergency power switch and activate
each boom function.
Result: All selected functions should
operate.
6. Turn off/base/platform key switch to
” base position.
7. Select emergency power
position from start/function enable/
emergency power switch and activate
each boom function.
Result: All selected functions should
operate.
HOUR METER
QUARTZ
COUNTER
Base Control
Console
Off/Base/Platform Key
Switch
Emergency Stop
Start/Function Enable/
Emergency Power Switch
Function Tests Section 2 - Familiarization

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ86T and is the answer not in the manual?

Skyjack SJ86T Specifications

General IconGeneral
BrandSkyjack
ModelSJ86T
CategoryBoom Lifts
LanguageEnglish

Related product manuals