7 Installing the new CON assembly
SMA Solar Technology AG
Replacement ManualCON-SMC9-11-RM-xx-1016
Connect the cables coming from the choke (A) to the screw terminals or spring clamp
terminals (torque for connection to screw terminals: 2.5Nm). When connecting the
cables, ensure the color assignment is correct (BK = black, BL = blue).
Mount the flat male tab onto the blade connector between the contactor and AC terminal
block (B).
Connect the residual-current monitoring unit's connection cable (G) to the screw terminals
(torque: 1.5Nm).
Connect the AC cable (C) to the screw terminals.
Connect the positive DC cable (D) to the screw terminals (torque: 1.5Nm).
Connect the cable of the Electronic Solar Switch (E) to the screw terminals (torque:
1.5Nm).
Connect the negative DC cable (F) to the screw terminals (torque: 1.5Nm).
A
C
H
F
G
B
D
E
9. Check the tension of every cable.