EasyManua.ls Logo

Smappee EV Wall - Installation and Activation

Smappee EV Wall
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Smappee EV Wall Installation manual - English
16
7. Installation and activation
This procedure describes the required steps for the physical installation of the EV Wall.
CAUTION: Make sure it is not possible to connect the electric current during
installation. Put up caution tape and warning signs to mark the work areas. Make sure
no unauthorised people can enter the work areas.
CAUTION: The electric system must be entirely disconnected from every power source
prior to performing installation or maintenance work. Make sure it is not possible to
connect the electric current during installation. Put up caution tape and warning signs
to mark the work areas. Make sure no unauthorised people can enter the work areas.
CAUTION: The charging station contains electric components that may still contain
electrical charge after being disconnected. Wait at least 10 seconds after disconnection
before commencing work.
CAUTION: Adaptors or conversion adaptors and cord extension sets are not allowed to
be used.
Place the mounting plate in position
a. Use the mounting plate to mark the position of the screws on the wall where the EV Wall is to be
positioned. Make sure the mounting plate is positioned with the 2 insert holes on the bottom, as
depicted below.

Other manuals for Smappee EV Wall