Figure 24: Connecting wires to the AC terminals
9.
Place the AC terminal cover over the AC terminals and push until a click is heard.
Close the Synergy Manager cover and secure it by tightening the six screws with a
torque of 3.5 N*m.
Chapter 4: Connecting AC and PV Strings to the Synergy Manager 44
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx