Power Control
Power control options are detailed in the
Power Control Application Note
, available on
the SolarEdge website at: https://www.solaredge.com/sites/default/files/application_
note_power_control_configuration.pdf.
The Grid Control option may be disabled. Enabling it opens additional options in the
menu.
The Energy Manager option is used for setting power export limitation, as described in
the
Export Limitation Application Note
, available on the SolarEdge website at:
https://www.solaredge.com/sites/default/files/feed-in_limitation_application_note.pdf.
Step 3: Verifying Proper Activation and
Commissioning
1. Select Information and verify that the correct firmware versions are installed on each
inverter.
2. Select Status and verify that inverter is operating and producing power.
3. Verify that additional configurations were properly set by viewing the relevant
Status screens.
4. Verify that the green inverter LEDis steadily lit.
Your SolarEdge power harvesting system is now operational.
Pre-commissioning (Off-Grid)
The following items are required for Pre-commissioning:
Mobile device with SolarEdge SetApp application
Power bank: 60W output port, USB-C Power Delivery (PD): 20V 3A (not provided)
USB cable: 3.3 ft (1 meter), male to male, USB-C (not provided)
IMPORTANT NOTE
Commissioning should be performed in full daylight.
NOTE
When pre-commissioning multiple inverters, each inverter need to be
commission individually.
To pre-commission the inverter:
1. Turn OFF and secure the AC circuit breaker in OFF position in the circuit breakers
panel.
Chapter 5: Activating, Commissioning and Configuring the System 48
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx