EasyManua.ls Logo

SolarEdge SE20K - Page 61

SolarEdge SE20K
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NOTE
There are no LED indicators on the Ethernet connector, if the inverter is not
communicating with the Monitoring platform through a LAN refer to
"Troubleshooting Communication" on page70
LAN Configuration
1.
The inverter is configured by default to LAN. If reconfiguration is required:
a. Verify the ON/OFF/P switch is OFF.
b. Verify the AC is on.
c.
Close the cover and turn ON the Synergy Manager.
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when
the Connection Unit cover is removed.
d. Use the SolarEdge SetApp to access the Commissioning main menu screen as
described in "Activating, Commissioning and Configuring the System" on
page45"Activating, Commissioning and Configuring the System" on page45 .
e.
From the Commissioning screen, tap Communication.
f.
Select Configure Ethernet, to configure the connection.
2.
Verify the connection, as described in "RS485 Bus Configuration" on page64
NOTE
The system automatically establishes communication with the
monitoring platform as it is configured to LANby default.
NOTE
If your network has a firewall, you may need to configure it to enable
the connection to the following address:
Destination Address: prodssl.solaredge.com
Modbus TCP Port: 443 (for incoming and outgoing data)
Chapter 6: Setting Up Communication with the Monitoring Platform 60
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx

Table of Contents

Related product manuals