EasyManua.ls Logo

SolarEdge StorEdge SE5K User Manual

SolarEdge StorEdge SE5K
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
MAN-01-00654-1.0 StorEdge Three Phase Inverter Wiring and On Site Check Quick Guide
StorEdge Three Phase Inverter with SetApp Configuration
Wiring and On Site Check Quick Guide for Europe, APAC
and South Africa
Revision History
Revision 1.0 Initial release (October 2019)
Overview
This document provides instructions for wiring and post-installation verification of a StorEdge system with the following
components:
StorEdge Three Phase Inverter with SetApp Configuration
Energy Meter
48V battery
For more details and additional system configurations, refer to the StorEdge Inverter Installation Guide supplied with the
StorEdge Inverter.
CAUTION!
For proper battery performance, the battery must remain connected to the StorEdge inverter and in charging
mode. Extended battery disconnection may result in deep discharge and damage the battery.
Wiring the System
Connecting the AC Grid
Use a five-wire cable. The maximum wire size for
the input terminal blocks is 4 mm².
1. Turn OFF the AC circuit breaker.
2. Open the AC grand and insert the AC cable through the
gland.
3. Pass the AC cable through the tunnel.
4. Thread the AC cable through two ferrite beads supplied with
the inverter: one 48 mm and one 39 mm.
5. Connect the AC cable to the AC terminals. Connect the PE
(grounding) wire first.
6. Tighten the terminal block screws with a torque of
1.2-1.5 N*m / 0.88-1.1 lb*ft.
DE Seite 5
FR Page 9
IT Pagina 13
SP Página 21
SW Sida 25
L1
L2
L3
N
PE
Question and Answer IconNeed help?

Do you have a question about the SolarEdge StorEdge SE5K and is the answer not in the manual?

SolarEdge StorEdge SE5K Specifications

General IconGeneral
BrandSolarEdge
ModelStorEdge SE5K
CategoryInverter
LanguageEnglish

Summary

Wiring the System

Connecting the AC Grid

Instructions for connecting the AC grid to the inverter, including wire size and torque settings.

Connecting the Energy Meter

Steps for connecting the communication cable from the Energy Meter to the inverter.

Connecting the Battery

Instructions for connecting DC power and CAN bus cables to the battery.

Post Installation Verification and Configuration

Installation and Wiring

Checklist for verifying system component installation and wiring connections.

Configuring the Meter and Battery

Guide for configuring the energy meter and battery settings via SetApp.

Support Contact Information

Setting up the Maximize Self-consumption (MSC)

Instructions for configuring the Maximize Self-consumption feature in SetApp.

Related product manuals