Do you have a question about the SolarEdge StorEdge SE5K-RWS and is the answer not in the manual?
Model | SE5K-RWS |
---|---|
Type | Hybrid Inverter |
AC Frequency | 50/60 Hz |
Max. DC Voltage | 600 V |
MPPT Voltage Range | 80 V - 500 V |
Battery Voltage | 48 V |
Max. Charge/Discharge Current | 100 A |
AC Power Output | 5 kW |
Number of MPP Trackers | 1 |
Ingress Protection | IP65 |
Rated Output Power | 5 kW |
Rated AC Power | 5 kW |
Communication Interfaces | RS485, Ethernet |
Operating Temperature Range | -25°C to 60°C |
Cooling | Convection |
Copyright and usage restrictions for the document.
Equipment tested to comply with local regulations for RF interference.
Details updates and changes made to the document in version 1.3.
Explanation of safety symbols used in the manual for hazard identification.
Critical safety guidelines and warnings for installation and operation.
Components of the StorEdge system and their interconnections.
Recommended tools and equipment required for system installation.
Guidelines for safely transporting and storing the inverter unit.
Safety precautions and warnings specific to power optimizer installation.
Procedures and recommendations for installing power optimizers correctly.
Instructions for physically mounting power optimizers to the support structure.
How to connect PV modules to the power optimizer input terminals.
Procedure for connecting power optimizers in series to form strings.
Steps to verify the correct electrical connection of power optimizers.
List of items included in the inverter package.
How to locate and identify the inverter's serial number and ratings.
Overview of the inverter's connectors, ports, and indicators.
Instructions for securely mounting the inverter unit to a structure.
Information about the internal RCD and selection of external RCDs.
Guidelines for installing the battery system in accordance with manufacturer instructions.
Steps for safely opening the inverter enclosure for internal access.
Procedure for connecting the inverter to the AC power grid.
How to connect the DC strings from PV modules to the inverter.
Instructions for connecting the Energy Meter for monitoring and management.
Steps for connecting the battery DC cables to the inverter.
How to establish communication between the inverter and battery via CAN bus.
Steps for securely closing the inverter enclosure after connections.
Guide to activating the inverter and system using the SetApp.
Steps for commissioning the system and configuring settings via SetApp.
Configuring essential system settings like country, grid, and language.
Process of logically pairing power optimizers with the inverter.
How to perform and interpret a self-test for the battery system.
Setting up applications like Maximize Self-consumption (MSC).
Overview of available communication methods for monitoring.
Instructions for establishing an Ethernet connection to the monitoring platform.
Guide to setting up an RS485 bus for connecting multiple inverters.
Steps to configure the RS485 bus, including leader/follower setup.
Procedures to confirm successful communication setup.
How to monitor installation data via the platform.
Methods for mapping system components for logical and physical layout.
Methods to identify and diagnose system errors using LEDs and the platform.
Guidance for resolving communication issues (Ethernet, RS485).
Troubleshooting specific error codes and issues related to the inverter.
Common malfunctions and corrective actions for power optimizers.
Physical dimensions and size of the StorEdge Three Phase Inverter.
Information on SafeDC compliance and procedures for disconnecting DC power.
Electrical output parameters of the inverter models.
Electrical input parameters for PV modules.
Electrical input parameters for battery connection.
Physical and installation-related specifications of the inverter.
Information on how to contact support for technical issues.