Figure 23: Connecting the inverters in a chain
NOTE
Do not cross-connect B, A and G wires.
6. Tighten the connector screws.
7. Check that the wires are fully inserted and cannot be pulled out easily.
8.
Connect the RS485-2 connector to the RS485 port on the communication board.
9.
Terminate the first and last SolarEdge inverter in the chain. The inverer can be
terminated by switching on (up) the left DIPswitch on the communication board.
Figure 24: RS485 termination switch
NOTE
Only the first and last SolarEdge inverter in the chain must be terminated. In
the other inverters in the chain, the DIPswitch must be in the off (down)
position.