Glue the lead skirting to the tile with silicon gel or PU
foam.
In case this stage is not well carried out, the collector
field’s lower edge can be seriously damaged in storms
or strong wind periods.
(50)
Adjust the lead skirting to the tiles.
To do so, we recommend that you use a soft rubber
hammer.
(51)
Roof cover:
The tiles must be installed upon the lateral pieces in
order to insure waterproofness. To do so, you might
have to cut the edges off in order to make sure that the
tiles lie flat on the flushing.
(52)
Finished integration of a 6m² set of collectors.
Installing the collectors - page 19
Technical changes may be made without notice