1 Installation
Pa 1
Installation
Pa 2
Electrical Connection
A
Check Packing List
User
Manual
Batte terminal (1 pairs)
Monitoring device 1pcs
3m batte communication cable 1pcs
Meter with 3 CTs 1pcs COM2 connector set (1pcs)
PE terminal 1pcs
COM3 connector set (1pcs)
AC connector set (3 pcs)
Inveer 1pcs
PV terminal
MHT-25~50K 8 pairs / MHT-40~50K-P 6 pairs
10m meter communication cable 1pcs
C
Installation Space
User guide
B
Installation Location
D
Installation Angle
Inveer bracket (1pcs)
Bolt assembly (4pcs)
M6 screws (2pcs)
≥450mm
≥300mm
≥600mm ≥600mm