ASSEMBLEASSEMBLE
4. Install dispensing door
Insert dispensing door assembly
into cylinders, beater rods first,
pushing handles all the way up
as you insert
Fit gaskets (2) into grooves on back
of door, flat side out; slide beater
guides (2) over beater rods (2), with
flanged edges against the door
Secure door assembly in a
cross-pattern using hand-
screws (4), with the long
hand-screws (2) on top
4g
4h
4i
Spaceman USA Soft Serve Pump Training
rev042219