Page 4 Seaich Corporation, LLC. All rights reserved. www.seaich.com
|
Spacerails, LLC. www.spacerails.com
Step 1: Interlock
all Base block tabs
as shown below.
Step 2: Press Base Holder A and
Base Holder B pieces into the Base
blocks for a more secure hold.
Illustration of base with tabs
locked and Base Holders installed.
Approximately 17% of actual size.
Step 1: Slide Arm Holder B of each arm on to a shaft and lock in place with Arm
Lock. Refer to the next page for orientation and location of each arm.
SHAFT ASSEMBLY
NOTE:
Please see the included full size
drawings for the next several steps.
This will simplify the positioning of
the base, arms, shafts, and the rail
cut lengths.
BASE ASSEMBLY