Page 16 Seaich Corporation, LLC. All rights reserved. www.seaich.com
|
Spacerails, LLC. www.spacerails.com
Rail Section 3:
Step1: Starting at the top Elevator Ring facing the back
of the base connect rail H (360 cm) to inner side of Rail
Clip. Keeping rail tight connect to arm A-5 then arm F-2
and K-1. Loop rail up to arm N-2 and K-4. Loop down to
K-2 and up to K-3 to create the inner loop. The inner loop
will shift inside the outer loop and pass right next to
shaft K and shaft N.
Step2: Create a banked rail through arm R-1 and arm
P-2. Continue rail through arm M-2 and arm J-1. Loop up
to arm J-2 and shift loop inside and up through arm G-1.
Finish by passing through arm E-2 and into the Rail Clip
on the bottom Elevator Ring in the center position.
Step3: Repeat Step 1 and Step 2 for the outer rail. Attach
Rail Clips to keep rails consistently spaced, supported,
and create a banked corner as needed.
For the double loop a good starting point for size is 20
cm for the outer loop and 10 cm for the inner loop.
For the single loop on the front try starting with a
10cmloop.
These numbers are intended to be a guide only. Test
your loops with the Marble. Adjust until you get good
consistent speed throughout this section.