EasyManua.ls Logo

Spacerails Level 8 - Page 16

Spacerails Level 8
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 16 Seaich Corporation, LLC. All rights reserved. www.seaich.com
|
Spacerails, LLC. www.spacerails.com
Rail Section 3:
Step1: Starting at the top Elevator Ring facing the back
of the base connect rail H (360 cm) to inner side of Rail
Clip. Keeping rail tight connect to arm A-5 then arm F-2
and K-1. Loop rail up to arm N-2 and K-4. Loop down to
K-2 and up to K-3 to create the inner loop. The inner loop
will shift inside the outer loop and pass right next to
shaft K and shaft N.
Step2: Create a banked rail through arm R-1 and arm
P-2. Continue rail through arm M-2 and arm J-1. Loop up
to arm J-2 and shift loop inside and up through arm G-1.
Finish by passing through arm E-2 and into the Rail Clip
on the bottom Elevator Ring in the center position.
Step3: Repeat Step 1 and Step 2 for the outer rail. Attach
Rail Clips to keep rails consistently spaced, supported,
and create a banked corner as needed.
For the double loop a good starting point for size is 20
cm for the outer loop and 10 cm for the inner loop.
For the single loop on the front try starting with a
10cmloop.
These numbers are intended to be a guide only. Test
your loops with the Marble. Adjust until you get good
consistent speed throughout this section.

Related product manuals