IM-P505-02-US Issue 1
21
UTM20 Series Ultrasonic Transit-time Flowmeters
Fig. 19
Fig. 20
4. Insert a wire for earth ground under the grounding bracket (see Figure 20 ) and screw it down tight.
5. Partially loosen the 2 enclosure captive screws on the left side of the transmitter cover. Completely
loosen the 2 screws on the right side. Grasp and lift the cover and open it to the left. The cover
remains attached and the left screws act as a hinge.
4 screws