12
STEP 2
First assemble the leg pieces by connecting Part 5 to each side of Parts 6-1 and 6-2. DO NOT FULLY TIGHTEN
THE SCREWS AT THIS STAGE TO ALLOW ROOM FOR ADJUSTMENT OF THE TRAMPOLINE FRAME DURING
ASSEMBLY.
Next, connect the assembled leg pieces to Part 1 and Part 2 as shown below.
IMPORTANT: MAKE SURE TO FULLY TIGHTEN ALL SCREWS AFTER THE ENTIRE
TRAMPOLINE FRAME IS ASSEMBLED IN STEP 3.
DO NOT PLACE HANDS NEAR THE
OPENING WHEN CONNECTING THE
TUBES. WEAR PROTECTIVE GLOVES TO
PROTECT FROM INJURIES DURING
ASSEMBLY.