Initial Setup continued
Figure 3. 18-Series Gauge
Hydraulic Pressure Gauge (optional)
Note: Hose can thread directly into pump body.
To install a hydraulic pressure gauge:
1. See Figure 3. For 18-series pumps not equipped
with a gauge port a T-adapter (PN 9760) is
necessary. Install Tee fitting.
2. Install sealant tape or non-hardening sealer to a
T-adapter. Install the T-adapter as shown.
3. Install sealant tape or non hardening sealer to
the gauge.
4. Install the pressure gauge.
1
2
3
Item Description
1 Gauge
2 Hose
3 T-adapter

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SPX Power Team PE184-2 and is the answer not in the manual?

SPX Power Team PE184-2 Specifications

General IconGeneral
BrandSPX
ModelPower Team PE184-2
CategoryWater Pump
LanguageEnglish

Related product manuals