User Assembly Manual
Blueleaf, Charwood House, Oakhurst Business
Park, SOUTHWATER, West Sussex, RH13 9RT, UK
www.steiss.co.uk
Assembly:
Tools required for assembly:
5 mm Allen key
1. Use the Allen ke
box.
Release both the screws
holding the back handle
frame (marked with a
circle)
Take note
screws
2. Remove the Styrofoam
from the main handle.
Rotate it so the indicator
will be facing up.
3. Insert the main handle into
the frame and secure it
with the screws.
Take note:
Posi
tion the load cell cable on the
grooves to avoid damages to the
cable.