EasyManua.ls Logo

STIEBEL ELTRON Accelera 300 - Page 4

STIEBEL ELTRON Accelera 300
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 | ACCELERA 300 WWW.STIEBEL-ELTRON-USA.COM
QUICK START-UP GUIDE | OPERATION
1 Vacuum breaker
2 Hot water connection (Union adaptor to 3/4")
3 Mixing valve (supplied by installer)
4 Connection for P&T valve ¾"
5 P&T valve ¾", 100 psi @210 °F (supplied with unit)
6 80 psi relief valve (optional, supplied by installer)
7 Expansion tank (supplied by installer)
8 Straight-through shut-off valve (supplied by installer)
9 Check valve (supplied by installer)
10 70 psi pressure reduction valve (supplied by installer)
11 Cold water connection (with Union adaptor to 3/4")
12 Condensate drain (elbow supplied with unit)
13 Drain valve (supplied by installer)
14 Drain pan (supplied by installer)
H
M
C
1
5
6
2
3
4
Cold water
7
8
9
10
Hot water
13
14
12
11

Table of Contents

Other manuals for STIEBEL ELTRON Accelera 300

Related product manuals