EasyManuals Logo

STIEBEL ELTRON DHE Connect 18 User Manual

STIEBEL ELTRON DHE Connect 18
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
INSTALLATION
Preparation
82|DHEConnect | DHETouch  www.stiebel-eltron.com
9.2 Minimum clearances
≥50≥50
≥90
≥90
D0000060809
Maintain the minimum clearances to ensure trouble-free op-
eration of the appliance and facilitate maintenance work.
9.3 Water installation
Flush the water line thoroughly.
Taps/valves
Use appropriate pressure taps. Open vented taps are not per-
mitted.
Note
Never use the 3-way ball shut-off valve in the cold water
inlet to reduce the flow rate; it is designed to shut off the
appliance only.
Permissible water line materials
- Cold water inlet line:
Pipes made from galvanised steel, stainless steel, copper or
plastic
- DHW outlet line:
Stainless steel pipe, copper pipe or plastic pipe
!
Material losses
If plastic pipework systems are used, take into account
the maximum inlet temperature and the maximum per-
missible pressure.
Flow rate
Ensure that the flow rate for switching on the appliance is
achieved.
Increase the water line pressure if the required flow rate is
not achieved when the draw-off valve is fully open.

Other manuals for STIEBEL ELTRON DHE Connect 18

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the STIEBEL ELTRON DHE Connect 18 and is the answer not in the manual?

STIEBEL ELTRON DHE Connect 18 Specifications

General IconGeneral
BrandSTIEBEL ELTRON
ModelDHE Connect 18
CategoryWater Heater
LanguageEnglish

Related product manuals