INSTALLATION
Commissioning
10.2 Installing the mini wireless remote control
You can attach the mini wireless remote control to the wall using
the wall mounting bracket.
Secure the wall mounting bracket to the wall using the adhe-
sive pad provided or a suitable countersunk screw (∅3mm
or less).
11. Commissioning
11.1 Initial start-up
≥ 60 s
D0000053277
Open and close all connected draw-off valves several times,
until all air has been purged from the pipework and the
appliance.
Carry out a tightness check.
D0000053278
Activate the safety switch by firmly pressing the reset button
(the appliance is delivered with the safety switch disabled).
In the DHEConnect18/21/24 and DHETouch18/21/24 appliances,
the medium connected load (21kW) is factory preset.
D0000053279
Connect the programming unit connecting cable plug to the
PCB.
D0000053280
Hook the appliance cover at the top rear into the back panel.
Pivot the appliance cover downwards. Check that the appli-
ance cover is securely fitted at both top and bottom.