INSTALLATION
Installation
22 | WWK 223-303 electronic www.stiebel-eltron.com
X0
2
L
L
N
N
PE
PE
L
N
PE
GNYE
BU
BN
1
1
2
X3
2
3
3
1
1
2
L1 / L2 / L3
N
A
B
D0000059152
A Power supply provided by power supply utility or energy
management system for switching the load (compressor)
B Power supply to impressed current anode and PCB
BN Brown
BU Blue
GNYE Green/yellow
f Connect the electric cables for the separate impressed cur-
rent anode power supply to X0/1 and X0/2.
!
Material losses
The power supply to the impressed current anode must
be continuously ensured.
!
Material losses
With regard to the external switching device, the min-
imum runtime and minimum pause times must be ob-
served (see chapter "Appliance description/Minimum
runtime and minimum pause time").
10.3.3 Connection options: Operation with external signal
transmitter
!
Material losses
See "Permissible voltage range for external signal trans-
mitters" in the "Specification/data table" chapter.
Note
The appliance has a second, higher set temperature
which is selected at the factory. This is activated in the
event of an external switching signal. Set temperature2
is higher ranking than the standard set temperature while
there is an external switching signal.
An external signal transmitter for switching a separate set DHW
temperature (set temperature2) can be connected to terminal
X3/1-2. In the delivered condition, terminal X3/1-2 is not assigned.
If this terminal is connected at the voltage stated in the specifica-
tion (see "Permissible voltage range, external signal transmitter")
(L to X3/1, N to X3/2), the appliance enables set temperature2.
Following one-off activation (signal present for at least 1min-
ute), set temperature2 applies for at least 20minutes. When
the relevant DHW set temperature has been reached, the com-
pressor switches off and remains off for a minimum idle time of
20minutes.
The following diagram illustrates the connections by means of a
sample signal sequence from an external signal transmitter.
Example:
Water temperature °C 55
Set temperature 1 °C 50
Set temperature 2 °C 65
1
0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 t [min]
B
1
1
0 2
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 t [min]
D0000034613
A External signal
B Compressor
1 20 min. minimum runtime, set temperature2
2 20 min. minimum compressor idle time
f Remove the appliance cover (see chapter "Cleaning and
maintenance/ Removing the appliance cover").
D0000056083
1
2
1 Strain relief
2 Terminal X3
f Prepare the electric cables in such a way that they terminate
with wire ferrules.
f Push the cables through one of the cable entries in the appli-
ance casing.
f Route leads through the strain relief.
f Connect the cables to X3.
Example 1 : Power-OFF signal with own 230V phase
X0
2
L
L
N
N
PE
PE
L
N
PE
GNYE
BU
BN
1
1
2
X3
2
3
3
1
1
2
L1 / L2 / L3
N
EVU
D0000059154
EVU Power supply utility
BN Brown
BU Blue
GNYE Green/yellow