Installation and commissioning as well as the maintenance of this equipment must only be carried
out by an authorised qualified contractor in accordance with these instructions.
WPMW II, WPMS II
Heat pump manager for heating system heat pumps
Operation and installation instructions
264755
Index
Operating instructions 2
1 Equipment overview 2
1.1 Equipment description 2
1.2 Operating and installation instructions 2
1.3 Maintenance and care 2
1.4 Important information 3
1.5 Operation 3
2 Adjustments 4
2.1 Operating modes (Control level 1) 4
2.2 Equipment menu (Control level 2) 5
2.3 Remote control FE 7 11
Installation instructions 12
1 Standard delivery 12
2 Wall mounting 12
3 Control panel mounting 12
4 Electrical connection 12
4.1 Electrical cables/leads 12
4.2 Fuses 12
4.3 Mains supply 12
4.4 Circulation pump and mixers 12
4.5 Temperature sensor 12
4.6 BUS connection 14
4.7 Remote control FE 7 14
4.8 Connection array WPMW II 15
4.9 Connection array WPMS II 16
5 Commissioning 17
5.1 BUS initialisation 17
5.2 System configuration 17
5.3 Reset options WPM II 17
5.4 Reset options IWS 17
5.5 Commissioning summary 18
5.6 Commissioning details 20
5.7 Fault remedies 27
5.8 Commissioning list 31
5.9 Checking adjustments at the IWS 32
6 Tables 33
6.1 Specification 33
6.2 Standard settings 33
6.3 Heating and DHW programs 34
Systemsketch 1 35
Systemsketch 2 35
Systemsketch 3 36
26_03_01_0019