The unit must be installed and connected in accordance with the
chapter on "installation" before initial commissioning.
• Make sure that the master switch is off and the unit is de-energized.
•
Open the electrical compartment door of the unit using the key provided.
• Check whether all power switches and control-circuit fuses in the electrical
section of the unit are switched off.
• Retighten all screw connections in the electric cabinet.
• Verify the smooth function of the contactors.
Power switch off
7. Commissioning
Electrical compartment
Size 1 Size 2
Humidifier board (optional)
Control circuit fuses
Power switches
Master switch