BUlLT_H iNSTALLATiON RECOMMENDATIONS
I M $"TA L LA"T I O M RECOMMENDATIONS
The importance of the installation of the
Sub-Zero B@lt-ln unit cannot be overempha-
sized. Installation should be done by a
qualified installer,
Before you begin the installation process, it
is recommended that you read this entire
Installation Instructions book. There are key
details that you should take special care to
observe during the installation, By reading
these instructions carefully, you will make the
installation process easier, problem-free and,
most importantly, safe.
Any questions or probJems about the
instaJJation shouJd be directed to your
Sub-Zero deaJer or the Sub-Zero Customer
Service Department at 800-222-7820 or e_maiJ
customerservice@subzero.com. You can aJso
visit our website at subzero.com.
TOOLS AND MA'IERIALS REQUIRED
The following is a list of tools and materials
that should be available for proper installation.
Phillips screwdriver set
Slotted screwdriver set
Torx drive screwdriver set
4' (1.2 mt of 1/4" copper tubing and saddle
valve for the water line--part #4200880
(do not use self-piercing valvest
Copper tubing cutter
Level--2' 66 mt and 4' (1.2 mt recom-
mended
Appliance Dolly able to support 700 Ibs
(317 kgt and adequate manpower to
handle the weight of the unit
Various sized pliers
Wrench set
Allen wrench set
5/16" hex bolt nut driver
Crescent wrenches
Cordless drill and assorted drill bits
Masonite, plywood01/s" pressed fiberboard,
cardboard or other suitable material to
protect finished flooring
Appropriate materials to cover and protect
the home and its furnishings during instal-
lation
/"_/ I//_eteI's s_liess ot ses_4, se s>e_i_e 3