EasyManua.ls Logo

Summers ULTIMATE NT - Page 29

Default Icon
192 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.15
SECTION 2 - SPRAYER OPERATION
B. Set up Normal Spraying and ll tank(s) through top llwell.
2. PRIME SPRAYER SYSTEM PUMP
A. Set up Normal Spraying.
B. Prime PTO driven pump:
1. Engage tractor PTO system and increase to normal eld PTO speed to circulate water from the
tank to the pump and back to the tank again through the agitators. Immediately verify agitator
ow by looking through top llwell.
2. Disengage tractor PTO system.

Related product manuals