12
It is advisable to fix the device to the steel channel. Before fixing the device, please make
sure:
• The built of cable trench meets the requirements of the device.
• The installation and holes of the steel channel meets the requirements of the device.
The device can also be fixed to the ground by foot screws. Drill holes on the ground and
make sure the dimensions of the holes are exactly the same with the holes of the device.
To fix the device, proceed as follows:
step 1 Drill holes on the steel channel or the ground according to the installation holes' dimension
identified on the installation dimension diagram.
step 2 Place the device to the steel channel or the ground; make sure the bottom installation holes
matches the drilled holes.
step 3 Fix the device to the steel channel or ground by M12 bolts, tightening torque: 60~70 N.m.
*The above pictures are for reference only, please refer to the actual product for details.
Connection sequence between the device base and channel steel is described below.
No.
Specification
No.
Specification
A Nut D Base of the device
B
Spring washer
E Channel steel
C Flat washer F M12 x 45 Bolt
- - End
4 Mechanical Mounting Installation Manual