9
Step 6 Clean and lubricate dead break connector, coupling adapter and insulating plug, then
connect them.
When wiring, reserve sufficient length in HV cables to avoid the impact of stress.
Meanwhile, make sure the cable labels are correct.
- - End
3.3 Cable Fixture
After completing wiring, fix the cable on the beam to avoid excessive stress on the cable.
1 Drill holes at the bottom of the MVT.
2 Install cable clamp crossbeam.
3 Lead cables through holes into the MVT.
When the wiring is completed, seal the gap between cables and holes with
fireproof/ waterproof materials such as fireproof mud to prevent foreign matter or
moisture from entering and affecting the long-term normal operation of the MVT!
User Manual 3 Electrical Connection