Look for chips or flaws in the surface and apply painting in damaged surfaces, preparing
the surface with sandpaper.
Avoid contact with vapors or corrosive gases as the chlorine and sulfur ones.
The spare parts that are given with the three phase pad-mounted transformer have to be
kept on a clean and dry place.
4.4.2 Cold Start
The following three requirements should be met for a cold start:
1 The transformer is not running;
2 The ambient temperature is below -20;
3 The equipment has been stored for over 3 days.
Cold Start Procedure
1 The transformer operates at no load for 8 hours.
2 Increase the load in 20% increments, and keep the transformer operating for at least 30
minutes at each step, until reaching the full load.
Cold start is completed.
4 Logistic & Handling User Manual

Other manuals for Sungrow SC3150UD-MV-US

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SC3150UD-MV-US and is the answer not in the manual?

Sungrow SC3150UD-MV-US Specifications

General IconGeneral
BrandSungrow
ModelSC3150UD-MV-US
CategoryStorage
LanguageEnglish

Related product manuals