9
2
Installation
Caution
▶ Installation of the machine should be performed by a trained engineer.
▶Any electrical wiring must be performed by a qualified technician or agent.
▶The machine weighs over 41kg. At least 2 persons should carry out the installing work.
▶Plug in after the installation is complete. If the operator mistakenly steps down on the pedal
with the plug in, the machine will start automatically and can cause physical injuries.
▶Connect the ground (earth) wire. An unstable connection may result in an electric shock or a
malfunction.
▶Place the belt cover on top of the machine.
▶Use both hands when bending the machine backwards or returning it to the normal position.
Using only one hand can lead to severe hand injuries due to the weight of the machine.
1) Installation of oil pan
After insert the oil pan① toward a table, fix it with fixing nails②.
[Figure 1]
①
②
②