EasyManua.ls Logo

SunStar SC-700A - Needle and Looper Timing Calibration; Thread Take-Up Lever Lubrication

SunStar SC-700A
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
3) Adjustment of needle and looper timing
- As in the figure, use the pulley to adjust the distance
between the bottom of the needle bar and the needle plate
face to be 12.8mm.
[Fig. 17]
- Adjust the distance between the retainer and the hooked needle to be 0.30.5mm, the distance between the needle and the
looper to be 0.10.2mm, and the distance between the looper groove and the bottom of the retainer to be 0.5mm.
[Fig. 18] [Fig. 19]
- Lift the needle bar by 10.8mm from the lowest position
of the needle bar and align the tip of the looper with the
needle.
[Fig. 20]
4)
Lubrication Adjustment of Thread Take-Up Lever
As in Fig. 21, oil flow is at its maximum when the mark
on the head of the oil flow control pin and the center of
the hole on the thread take-up lever crank shaft is directly
aligned. In contrast, oil flow decreases when the mark is
turned closer to the corner of the link cam washer.
Furthermore, if the mark passes the corner of the link cam
washer, oil will not flow at all.
[Fig. 21]

Related product manuals