1 / 15
SW51B100TW2/SW51B200TW2
Battery System Quick Installation Guidance
51.2V 5.22KWH/10.44KWH
CAUTION
*
Ensure to read the Guidance before installation in order to understand product
information and safety precautions.
*
Operators should be well trained to fully understand grid-connected photovoltaic power
system and national/regional standards.
*
Installers must use insulating tools and wear safety equipment.
*
Device damages caused noncompliance with storage, transportation, installation and usage
requirements specified in Quick Guidance and Manual are not coved by Warranty.