EasyManua.ls Logo

SUPREME 1700TR - Operating Procedures and Best Practices

Default Icon
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
Mechanical Stationary
Operator’s Manual
300-0804 © 05/2020
OPERATION
Categories of Hay
󰀨
coastal grasses, Bermuda grasses, green feed, silage bales and any grasses not mentioned above.
Loading Sequence and Mixing
The sequential loading of your Supreme Feed Processor is crucial to achieving desirable mixing results. It is an absolute

Ensure that the feed processor is being loaded on level ground. Our recommended sequence as follows:
1. 󰀨
2. Engage mixing augers.
3. Turn on scale, as per Digi-star / Dinamica Generale scale operation & installation manual.
4. 
Very important:
minerals etc. at the desired weights per your ration requirements.
Small and large square bales will require very little break up and initial cutting time. Large round bales of Bermuda
or coastal hay may require a longer initial cutting time to achieve a coarse cut. Careful not to over process these
materials before adding other ingredients to the ration.
5. Load ingredients such as silage and haylage.
Note: The forage will continue to be cut when heavier ingredients and commodities are added.
6. Load minerals, proteins and other small quantity ingredients.
7. Load grain and commodities.
8. Load all liquids (ex: fats, water, molasses, etc.) into the center of the tub.
9. 󰀨.
Final mix time and loading sequence may need to be altered to achieve the desired results.
Unloading
To begin the unloading process open the discharge door approximately 3/4 open and engage augers, if they have been
stopped.

Table of Contents

Related product manuals