EasyManua.ls Logo

SUPREME 1700TR - Initial Break-In; After the First 10 Hours of Operations; After the First 100 Hours of Operations

Default Icon
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
Mechanical Stationary
Operator’s Manual
300-0804 © 05/2020
INITIAL BREAK-IN
With all new mechanical equipment, a certain break-in period is required to allow components and mechanical devices to
seat and mesh properly.
Supreme International recommends the following items be completed at the prescribed time lines in order to fully take
advantage of Supreme International’s reputation for strength and reliability. For maintenance intervals, see 
36.
After the rst 10 hours of operations After the rst 100 hours of operations
Check and tighten all fasteners holding the knives on
the auger (see 
38 and 

39)
Visually inspect oil lines and hydraulic lines for leaks.

Check and tighten scale head-swivel adjustment knob.
Grease all driveline components with two pumps
(except gearboxes) as shown in 
37.
Change oil in all pump drives, and gearboxes to

after initial break-in.

Table of Contents

Related product manuals