EasyManua.ls Logo

Suzuki df2.5 - Page 69

Suzuki df2.5
204 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6·6
POWER
UNIT
FINAL ASSEMBLY CHECK
Perform the
fo
ll
ow
in
g checks
in
order to ensure proper and
sa
fe
operation of the repai
re
d unit.
• All pa
rt
s removed have be
en
returned to
th
e origin
al
pos
i-
tions.
• Lower unit gear engagement
is
properly adjusted.
(See page 8-19.)
• Fuel hose routing matchs service manual illustration.
(See
page 9-2.)
• Wire routing matchs service manual illustration.
(See
page 9-3
.)
• No fuel leakage
is
evide
nt.
• No
wa
ter leakage is evident during final test running.

Table of Contents