3-23
OPERATION
Raise the lift arms and tilt the bucket forward, then release it as the machine is driven forward.
Next tilt the bucket forward and lower the front edge until it is slightly above the ground
surface, then back the machine over the load that was just released.
Backļ¬lling
With the bucket lowered, drive near the hole and tilt the front edge of the bucket downward as
soon as it passes over the near side of the hole. Raise the bucket and empty the load only
when necessary.
Leveling
OPERATING PROCEDURES